Showing 381 - 400 results of 2,569 for search '((spinnae OR pine) OR (((spie OR ((swing OR wing) OR pinggk)) OR (peng OR pin)) OR (naing OR min)))', query time: 0.21s Refine Results
  1. 381
  2. 382
  3. 383
  4. 384
  5. 385
  6. 386
  7. 387
  8. 388
  9. 389

    Engineering pressure retarded osmosis membrane bioreactor (PRO-MBR) for simultaneous water and energy recovery from municipal wastewater by Liu, Shuyue, Song, Weilong, Meng, Manli, Xie, Ming, She, Qianhong, Zhao, Pin, Wang, Xinhua

    Published 2023
    “…Nevertheless, flux decline due to membrane fouling is still a restricting factor to power generation of PRO-MBR, its power density was decreased by 38.2% in the first 60 min due to the formation of fouling. Overall, in perspective of technoeconomic feasibility, the PRO-MBR demonstrates better potential than FO-MBR in wastewater treatment and reclamation and deserves more research attention in the future.…”
    Get full text
    Journal Article
  10. 390
  11. 391
  12. 392
  13. 393
  14. 394
  15. 395
  16. 396
  17. 397
  18. 398
  19. 399
  20. 400