-
441
Structural performance of recycled aggregate concrete-filled stainless steel tube columns
Published 2020“…The experiment involved 12 RACFSST columns tested under pin-ended condition, as well as material tests and initial global geometric imperfection measurements. …”
Get full text
Final Year Project (FYP) -
442
Design and 3D printing of reconfigurable structures
Published 2021“…The structure is made up of single modular units being repeatedly fixed together, this leads to the structure to isolate single modular units that are damaged, allowing it to be easily pin-pointed and replaced by fabricating another similar single unit, this cut cost as the structure can be salvaged by replacing a single unit instead of the whole structure.…”
Get full text
Final Year Project (FYP) -
443
Tie the knot - a step by step wedding planner
Published 2018“…The creation comprises essential management tools such as wedding checklist, reminders, budget tracker, guestlist, online electronic invitation and RSVP system with SMS function, seating plan, calendar function, vendor list, pin board, wedding day scheduler and chat function…”
Get full text
Final Year Project (FYP) -
444
Design of conditioning unit for data transmission over power distribution lines
Published 2008Get full text
Thesis -
445
-
446
Pre-planned recovery schemes with delay consideration for high speed networks
Published 2008Get full text
Thesis -
447
-
448
-
449
Dated
Published 2016“…Dated is a 2D hand drawn animation film done by Tan Ping Hao, Melissa Sing, Wang Jia Ying and myself. …”
Get full text
Final Year Project (FYP) -
450
The use of unified power flow controller to enhance power system stability
Published 2008Get full text
Thesis -
451
-
452
-
453
-
454
-
455
Finite element analysis on post-buckling of thin-walled structures using ANSYS
Published 2015“…The results obtained were checked against experimental data and led to the development and the revision of design procedures for the pin-ended lipped column and hollow box section.…”
Get full text
Final Year Project (FYP) -
456
-
457
-
458
-
459
Study of connection re-routing schemes for ATM-based wireless networks
Published 2008Get full text
Thesis -
460