Search alternatives:
billy » bill (Expand Search), bills (Expand Search)
fills » films (Expand Search), fill (Expand Search), files (Expand Search)
drago » drag (Expand Search), draco (Expand Search), drao (Expand Search)
dragos » drags (Expand Search), dracos (Expand Search), draos (Expand Search)
dragon » dragn (Expand Search), dracon (Expand Search), draon (Expand Search), ragon (Expand Search)
dracon » deacon (Expand Search), draco (Expand Search)
drains » grains (Expand Search), brains (Expand Search), trains (Expand Search), drawns (Expand Search)
drain » brain (Expand Search), drawn (Expand Search), train (Expand Search)
billy » bill (Expand Search), bills (Expand Search)
fills » films (Expand Search), fill (Expand Search), files (Expand Search)
drago » drag (Expand Search), draco (Expand Search), drao (Expand Search)
dragos » drags (Expand Search), dracos (Expand Search), draos (Expand Search)
dragon » dragn (Expand Search), dracon (Expand Search), draon (Expand Search), ragon (Expand Search)
dracon » deacon (Expand Search), draco (Expand Search)
drains » grains (Expand Search), brains (Expand Search), trains (Expand Search), drawns (Expand Search)
drain » brain (Expand Search), drawn (Expand Search), train (Expand Search)
-
1
Land reclamation - from conventional vertical drain methods to a combined vacuum preloading and electro-osmosis with horizontal drainage enhanced geotextile sheets
Published 2023“…The major challenges include the extra time required for consolidating the clay slurry and the formation of a working platform for construction, which are not necessary if sandy fill material is adopted. Consolidation analysis of drained reclamation work is a key aspect in assessing the performance of the ground improvement work conducted. …”
Get full text
Thesis-Master by Research -
2
Batch versus continuous feeding strategies for pharmaceutical removal by subsurface flow constructed wetland
Published 2013“…For all compounds tested except naproxen, values for first-order decay constants (k) for drain and fill operation were higher than that for the continuous mode of operation. …”
Get full text
Get full text
Journal Article -
3
Finite element analysis of a free-standing concrete sea-wall as alternative to traditional land reclamation
Published 2018“…It is connected on its longer side continuously so that it forms a wall barrier in which 20 m of seawater level will be drained from the usable side. Analysis is made to determine the stability of the caisson seawall embedded at three depths: 40 m, 20 m, and 15 m. …”
Get full text
Final Year Project (FYP)