Showing 141 - 160 results of 1,066 for search 'District Bank', query time: 0.16s Refine Results
  1. 141

    A STUDY ON PERFORMANCE OF THE HIMACHAL PRADESH STATE CO-OPERATIVE BANK LIMITED by Dr. Mohinder Paul, Dr. Kuldeep Kumar Attri

    Published 2016-07-01
    “…It serves as a link between RBI/NABARD at national level, District Central Co-operative Banks at district level and Primary Cooperative Societies at village level. …”
    Get full text
    Article
  2. 142

    Dynamic of land use and vegetation change in the eastern bank of Bénoué (North Cameroon) by Djosebe Azaria, Froumsia Moksia, Tchobsala, Kamblaba Pierre, Prudence Tezore Bakary

    Published 2024-03-01
    “…Abstract The eastern part of the Benoue River bank is undergoing degradation marked by a significant decrease in vegetation cover and woody resources due to anthropogenic activities and climatic. …”
    Get full text
    Article
  3. 143
  4. 144
  5. 145

    PELAKSANAAN PERJANJIAN KREDIT SINDIKASI PADA BANK NAGARI CABANG UTAMA PADANG by , Lola Muchtar, , Prof M.Hawin, SH, LLm, PHd

    Published 2011
    “…Settlement Loan Syndication If Debtor Doing Achievement Wan pursued through legal channels if there is a difference, where private banks through the District Court and to the Bank through the Government Affairs Committee of the State Receivables (PUPN) / Directorate General of State Accounts Receivable and Auction (DJPLN). …”
    Thesis
  6. 146

    Sarmatian Barrow 1 of Kotlovina I Cemetery on the Left Bank of the Lower Danube by Sergey O. Simonenko, Sergey D. Lysenko, Sergey N. Razumov, Vitalij S. Sinika

    Published 2020-08-01
    “…The paper deals with analyzing the Sarmatian burial complex investigated in 1990 in the barrow 1 of Kotlovina I cemetery located on the western shore of the lake Yalpug, 3 km from the village of the same name in Reni district of Odessa region. Materials. The mound was surrounded by a circular ditch with a single gap in the south. …”
    Get full text
    Article
  7. 147

    Innovative Modernization of Building Heating Systems: The Economy and Ecology of a Hybrid District-Heating Substation by Katarzyna Stokowiec, Sylwia Wciślik, Dagmara Kotrys-Działak

    Published 2023-02-01
    “…Therefore, the thermomodernization of a district-heating substation was proposed. Several scenarios, including different renewable energies (an air–water heat pump versus a heat pump with photovoltaics), different investment financing (equity or bank credit), and different purposes for heating demand (central heating or central heating with ventilation and domestic hot water), were analyzed. …”
    Get full text
    Article
  8. 148

    POTENTIAL FOR MANAGING WASTE GROWTH BASED ON DIGITAL PLATFORM IN HULU SUNGAI TENGAH DISTRICT, INDONESIA by Saputra M., Mahreda E.S., Lilimantik E., Mahyudin R.P.

    Published 2022-11-01
    “…The study was conducted at the business location of the Mandiri Urban Garbage Bank, Bukat Village Council, Barabai District, Hulu Sungai Tengah Regency. …”
    Get full text
    Article
  9. 149
  10. 150

    Analysis of <i>Puumala orthohantavirus</i> Genome Variants Identified in the Territories of Volga Federal District by Emmanuel Kabwe, Walaa Al Sheikh, Anton F. Shamsutdinov, Ruzilya K. Ismagilova, Ekaterina V. Martynova, Olesia V. Ohlopkova, Yuri A. Yurchenko, Tatiana A. Savitskaya, Guzel S. Isaeva, Svetlana F. Khaiboullina, Albert A. Rizvanov, Sergey P. Morzunov, Yuriy N. Davidyuk

    Published 2022-03-01
    “…Hemorrhagic fever with renal syndrome (HFRS) is a zoonotic disease commonly diagnosed in the Volga Federal District (VFD). HFRS is caused by <i>Puumala</i> <i>orthohantavirus</i> (PUUV), and this virus is usually detected in bank voles as its natural host (<i>Myodes glareolus</i>). …”
    Get full text
    Article
  11. 151
  12. 152

    Effects of financial institutions' management effectiveness on financial inclusion in Mbeya city and Mbeya rural district by Kaula Stephen, Gwahula Raphael

    Published 2023-08-01
    “…The study was conducted in both Mbeya City and Mbeya rural district. A sample of 210 respondents was selected from a population of 1,000 financial users and providers using a simple random sampling technique. …”
    Get full text
    Article
  13. 153

    District health programmes and health-sector reform: case study in the Lao People's Democratic Republic by Perks Carol, Toole Michael J, Phouthonsy Khamla

    Published 2006-01-01
    “…The Lao People's Democratic Republic (Lao PDR) is classified by the World Bank as a low-income country under stress. Development partners have sought to utilize effective aid instruments to help countries classified in this way achieve the Millennium Development Goals; these aid instruments include sector-wide approaches (SWAps) that support decentralized district health systems and seek to avoid fragmentation and duplication. …”
    Get full text
    Article
  14. 154

    Isolation and Characterization of Two PHA Producing Strains Isolated from Soil Sample of Nalgonda District by M. Thirumala, E. Sai Krishna, P. Sindhu Priya, S. Vishnuvardhan Reddy

    Published 2022-12-01
    “…The 16S rDNA gene sequences of these two isolates were submitted to the NCBI Gene bank and the accession numbers were also sought.…”
    Get full text
    Article
  15. 155

    KEJAHATAN MONEY LAUNDERING DALAM PEMILUKADA (RE-ORIENTASI DAN RE-EVALUASI NILAI TERHADAP KEBIJAKAN PELAKSANAAN PEMILUKADA) by M. Arief Amrullah

    Published 2013-12-01
    “…The medium for the hiding process was through either bank or nonbank as what people always said so far. …”
    Get full text
    Article
  16. 156

    Molecular Epidemiology of <i>Theileria annulata</i> in Cattle from Two Districts in Punjab (Pakistan) by Asia Parveen, Abeer Mousa Alkhaibari, Muhammad Asif, Hamdan I. Almohammed, Zahra Naqvi, Adil Khan, Munir Aktas, Sezayi Ozubek, Muhammad Farooq, Furhan Iqbal

    Published 2021-12-01
    “…A total of 428 cattle blood samples were collected from Districts Lodhran (<i>n</i> = 218) and Dera Ghazi Khan (<i>n</i> = 210). …”
    Get full text
    Article
  17. 157
  18. 158
  19. 159

    Study of Flood Risk Assessment on Banyumas and Cilacap District in Downstream Serayu River Basin, Indonesia by Pratita Hana Kirana, Mohammad Farid, Mohammad Bagus Adityawan, Arno Adi Kuntoro, Widyaningtyas

    Published 2023-08-01
    “…River geometry uses river cross-section from field measurement data for hydraulic modeling combined with MERIT DEM as its banks. The capacity level also refers to the BNPB Number 2 the Year 2012. …”
    Get full text
    Article
  20. 160