Published 2015-12-01
“…In this paper, we develop the following three options of electrical power systems: electric power system Gash Barka excluding autonomous diesel generators that exist in the
province (that new electrical power supply system will be powered by a central power supply system of
Eritrea and the existing diesel generators can be used as a backup during a power outage or emergency); the electrical power supply system which powers only twelve of the fourteen areas under the Gash Barka region from the central system power supply of
Eritrea (the other two areas under the Gash Barka region will be powered by autonomous diesel generators; the system can automatically switch on to a backup power source in the event of an accident, or when there will be a power outage on either side of the power system); the electrical power supply system which powers only eleven of the fourteen areas under the Gash Barka region from the central power supply system of
Eritrea (and the other two sub zones of Gash Barka will be powered by autonomous diesel generators; the system can automatically switch on to a backup power source in the event of an accident or, when, ever there will a power outage on either side of the power system)…”
Get full text
Article