-
1
Continuous line production of a chocolate biscuit from the saw materials to the mapped product/
Published 1974“…London : Institution of Production Engineers,…”
-
2
A continuous system of blending, counting and packing biscuits to close-limit weights/
Published 1974“…London : Institution of Production Engineers,…”
-
3
Management guide to health and safety and safety at work
Published 1977“…London : Institution of Production Engineers,…”
-
4
-
5
-
6
-
7
The contribution of sidewall hovercraft to the evolution of the marine ferry/
Published 1974“…London: Institution of Production Engineers…”
-
8
Problems in the design, construction of an assembling machine/
Published 1968“…London : Institution of Production Engineers,…”
-
9
Product design for automated assembling /
Published 1974“…London : Institution of Production Engineers,…”
-
10
-
11
A feasibility study in feeding pinions in a clock assembly/
Published 1974“…London: Institution of Production Engineers,…”
-
12
Improvements in design of rivet setting machines/
Published 1974“…London: Institution of Production Engineers,…”
-
13
A multi-head machine for assembling plastics sports and caps to metal cans/
Published 1974“…London: Institution of Production Engineers,…”
-
14
Cost consideration in automated assembling/
Published 1974“…London: Institution of Production Engineers,…”
-
15
Control system applied to automated assembling/
Published 1974“…London: Institution of Production Engineers,…”
-
16
Control systems applied to automated assembling/
Published 1974“…London: Institution of Production Engineers,…”
-
17
A multi-station in-line transfer machine for assembling a coolant pump/
Published 1974“…London: Institution of Production Engineers,…”
-
18
Pre-production cost savings-planning and tooling/
Published 1974“…London : Institution of Production Engineers,…”
-
19
-
20