Production standards for profit planning /
22
Príomhchruthaitheoirí: | 205037 Tucker, Spencer A., Lennon, Thomas H. |
---|---|
Formáid: | |
Foilsithe / Cruthaithe: |
New York : Van Nostrand Reinhold Co,
1982
|
Ábhair: |
Míreanna comhchosúla
Míreanna comhchosúla
-
Profit planning decisions with the break-even system /
de réir: 205037 Tucker, Spencer A.
Foilsithe / Cruthaithe: (1980) -
The application of statistical methods to industrial standardization and quality control /
de réir: 8096 British Standards Institution, et al. -
Malaysian Standards : Complete collection 2006 / [cakera padat]
de réir: Malaysia. Department of Standards
Foilsithe / Cruthaithe: (2006) -
Study on the usage of Malaysian standards : final report /
de réir: SIRIM Berhad, et al.
Foilsithe / Cruthaithe: (2012) -
Implementing standardized work : writing standardized work forms /
de réir: Patchong, Alain, author
Foilsithe / Cruthaithe: (2013)