Group technology application in reducing setup time/

To cope with the demands of variety of peoducts, radical setup time reduction is essential. The objective of this project is to reduce the setup time using GT and SMED. Tje literature study, has been done to study the relevance of GT nd SMED as a core element in reducing setup times. A case study wa...

Full description

Bibliographic Details
Main Author: 289665 Lim, Seong Kuan
Format:
Published: Sekudai: UTM, 1993
Subjects: