Assessment the unused capacity using time driven activity based costing in automotive manufacturing industry

Automotive Manufacturing Industry usually known implementing all six sigma method and lean manufacturing. However, actual practicality in the world of manufacturing, there are a lot of factors contributes that become the challenge to the ideal of lean production line. Not exclude those factors, ther...

Full description

Bibliographic Details
Main Authors: N. F. A., Ghani, S. N. A. M., Zaini, Mohd Yazid, Abu
Format: Article
Language:English
Published: Penerbit UMP 2020
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/28189/7/Assessment%20the%20unused%20capacity%20using%20time%20driven%20activity.pdf