Skip to content
VuFind
    • English
    • Deutsch
    • Español
    • Français
    • Italiano
    • 日本語
    • Nederlands
    • Português
    • Português (Brasil)
    • 中文(简体)
    • 中文(繁體)
    • Türkçe
    • עברית
    • Gaeilge
    • Cymraeg
    • Ελληνικά
    • Català
    • Euskara
    • Русский
    • Čeština
    • Suomi
    • Svenska
    • polski
    • Dansk
    • slovenščina
    • اللغة العربية
    • বাংলা
    • Galego
    • Tiếng Việt
    • Hrvatski
    • हिंदी
    • Հայերէն
    • Українська
    • Sámegiella
    • Монгол
Advanced
  • Optimization of Assembly Line...
  • Cite this
  • Text this
  • Email this
  • Print
  • Export Record
    • Export to RefWorks
    • Export to EndNoteWeb
    • Export to EndNote
  • Permanent link
Optimization of Assembly Line Balancing with Resource Constraint using NSGA-II: A Case Study

Optimization of Assembly Line Balancing with Resource Constraint using NSGA-II: A Case Study

Assembly line balancing type-e problem with resource constraint (ALBE-RC) is an attempt to assign the tasks to a minimal number of workstation with minimum cycle time by considering the resource constraint. Due to rapid growth in manufacturing and limited number of resources in industry, all the tas...

Full description

Bibliographic Details
Main Authors: Masitah, Jusop, M. F. F., Ab Rashid
Format: Article
Language:English
English
English
Published: Research India Publications 2016
Subjects:
TJ Mechanical engineering and machinery
Online Access:http://umpir.ump.edu.my/id/eprint/8243/1/Optimization%20of%20Assembly%20Line%20Balancing%20with%20Resource%20Constraint%20using%20NSGA-II-%20A%20Case%20Study.pdf
http://umpir.ump.edu.my/id/eprint/8243/7/c-f158.pdf
http://umpir.ump.edu.my/id/eprint/8243/13/fist-2017-mashitah-%20Optimization%20of%20Assembly%20Line%20Balancing%20with%20Resource.pdf
  • Holdings
  • Description
  • Similar Items
  • Staff View

Internet

http://umpir.ump.edu.my/id/eprint/8243/1/Optimization%20of%20Assembly%20Line%20Balancing%20with%20Resource%20Constraint%20using%20NSGA-II-%20A%20Case%20Study.pdf
http://umpir.ump.edu.my/id/eprint/8243/7/c-f158.pdf
http://umpir.ump.edu.my/id/eprint/8243/13/fist-2017-mashitah-%20Optimization%20of%20Assembly%20Line%20Balancing%20with%20Resource.pdf

Similar Items

  • Multi-objective optimisation of assembly line balancing type-e problem with resource constraints
    by: Masitah, Jusop
    Published: (2016)
  • Modelling and optimization of assembly line balancing with multi-resource constraints
    by: Ab Rashid, Mohd Fadzil Faisae
    Published: (2013)
  • Optimization of mixed-model assembly line balancing problem with resource constraints
    by: M. M., Razali, et al.
    Published: (2017)
  • Modelling and optimization of assembly line balancing with multi-resource constraints
    by: Ab Rashid, Mohd Fadzil Faisae, et al.
    Published: (2017)
  • Optimisation of Assembly Line Balancing Type-E with Resource Constraints using NSGA-II
    by: Masitah, Jusop, et al.
    Published: (2016)

Search Options

  • Search History
  • Advanced Search

Find More

  • Browse the Catalog
  • Browse Alphabetically
  • Explore Channels
  • Course Reserves
  • New Items

Need Help?

  • Search Tips
  • Ask a Librarian
  • FAQs