Case Study: Effects of a Partial-Debris Dam on Riverbank Erosion in the Parlung Tsangpo River, China
This paper examines two successive debris flows that deposited a total of 1.4 million m3 of sediment into the Parlung Tsangpo River in China in 2010. As a result of these deposits, a partial-debris dam was formed in the river. This dam rerouted the discharge in the river along one of the riverbanks,...
Main Authors: | , , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2018-02-01
|
Series: | Water |
Subjects: | |
Online Access: | http://www.mdpi.com/2073-4441/10/3/250 |