The Estimation Modeling of Abutment Volume with Variations of Bridge Span, Abutment Height, and Seismic Zone

The initial cost of a bridge project determined using an estimation model depends on the dimensions, types, and materials but only a few studies have included bridge location as a determinant variable. The inclusion of the location is, however, important due to the different seismic accelerations an...

Full description

Bibliographic Details
Main Authors: Dicky Rahadian Mahendra, Andreas Triwiyono
Format: Article
Language:English
Published: Universitas Gadjah Mada 2021-01-01
Series:Journal of the Civil Engineering Forum
Subjects:
Online Access:https://jurnal.ugm.ac.id/jcef/article/view/55280