The Estimation Modeling of Abutment Volume with Variations of Bridge Span, Abutment Height, and Seismic Zone
The initial cost of a bridge project determined using an estimation model depends on the dimensions, types, and materials but only a few studies have included bridge location as a determinant variable. The inclusion of the location is, however, important due to the different seismic accelerations an...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Universitas Gadjah Mada
2021-01-01
|
Series: | Journal of the Civil Engineering Forum |
Subjects: | |
Online Access: | https://jurnal.ugm.ac.id/jcef/article/view/55280 |