EirGrid's met mast and alternatives study

Abstract The current grid code in Ireland requires wind farms to deliver meteorological data to the two transmission system operators. The importance of accurate on‐site measured wind speed signals increases as a function of the installed wind capacity. Since wind farms have been installed with vary...

Full description

Bibliographic Details
Main Authors: Corinna Möhrlen, Diarmuid Ó Foghlú, Séamus Power, Gill Nolan, Kenneth Conway, Eric Lambert, John Ging
Format: Article
Language:English
Published: Wiley 2022-07-01
Series:IET Renewable Power Generation
Online Access:https://doi.org/10.1049/rpg2.12502