Seismic Isolation Materials for Bored Rock Tunnels: A Parametric Analysis
Most recent tunnel designs rely on more thorough analyses of the intricate rock interactions. The three principal techniques for excavating rock tunneling are drill-and-blast for complete or partial cross-sections, TBM only for circular cross-sections with full faces, and road header for small porti...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2024-02-01
|
Series: | Infrastructures |
Subjects: | |
Online Access: | https://www.mdpi.com/2412-3811/9/3/44 |