Method for production forecast in demand-synchronized production
In demand-synchronized production, when constructing flexible production systems to produce a variety of products while maintaining high efficiency, a preparation lead time is required because of such physical constraints as making setup changes and supplying facilities. Preparation lead time must a...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
The Japan Society of Mechanical Engineers
2014-12-01
|
Series: | Journal of Advanced Mechanical Design, Systems, and Manufacturing |
Subjects: | |
Online Access: | https://www.jstage.jst.go.jp/article/jamdsm/8/6/8_2014jamdsm0076/_pdf/-char/en |