Failure analysis of primary waste heat boiler tube in ammonia plant
The primary Waste Heat Boiler (WHB) in an ammonia plant experienced cap leaking and the outer tube rupture after ten months since the last repair and replacement (total retubing). The leaking cap and the outer tube materials are low carbon steel SA-204 Gr. B and SA-209 Gr. T1a. The inappropriate ver...
Main Authors: | Husaini Ardy, Yudhistira Perdana Putra, Adimas Dwi Anggoro, Arie Wibowo |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2021-02-01
|
Series: | Heliyon |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2405844021002565 |
Similar Items
-
Failure Analysis of Bank-Wall Side Boiler Tube in a Petrochemical Plant
by: Husaini Ardy, et al.
Published: (2022-11-01) -
Computer assisted design procedure of water tube boilers /
by: 318313 Ong, Eng Hock
Published: (1990) -
A study on water quality and corrosion on boiler tubes /
by: 287923 Aliza Baharom
Published: (1995) -
Computer assisted procedure of water tube boilers / [mikrofilem]
by: 318313 Ong, Eng Hock -
EFFECT OF TEMPERATURE ON CORROSION OF CARBON STEEL BOILER TUBES IN DILUTE SODUIM CHLORIDE SOLUTION
by: G.A. Rassoul, et al.
Published: (2008-09-01)