Selection of the optimum pushbacks in a long-term planning process of the open pit: A condition for maximization the net present value: Case study: The open pit Veliki Krivelj, Serbia

Defining the pushbacks at the open pit is one of the most important planning activities. Designing the pushbacks is the first step in a long-term planning of production at the open pit where the production is planned. Despite the existence of a large number of software, used for different mathematic...

Full description

Bibliographic Details
Main Authors: Kržanović Daniel, Vušović Nenad, Ljubojev Milenko
Format: Article
Language:English
Published: Mining and Metallurgy Institute, Bor 2018-01-01
Series:Mining and Metallurgy Engineering Bor
Subjects:
Online Access:https://scindeks-clanci.ceon.rs/data/pdf/2334-8836/2018/2334-88361802037K.pdf