Selection of the optimum pushbacks in a long-term planning process of the open pit: A condition for maximization the net present value: Case study: The open pit Veliki Krivelj, Serbia
Defining the pushbacks at the open pit is one of the most important planning activities. Designing the pushbacks is the first step in a long-term planning of production at the open pit where the production is planned. Despite the existence of a large number of software, used for different mathematic...
Main Authors: | Kržanović Daniel, Vušović Nenad, Ljubojev Milenko |
---|---|
Format: | Article |
Language: | English |
Published: |
Mining and Metallurgy Institute, Bor
2018-01-01
|
Series: | Mining and Metallurgy Engineering Bor |
Subjects: | |
Online Access: | https://scindeks-clanci.ceon.rs/data/pdf/2334-8836/2018/2334-88361802037K.pdf |
Similar Items
-
The impact of an error in selection the pushbacks in the long-term planning of the open pit production on project quality, case study: Open pit Veliki Krivelj, Bor, Serbia
by: Kržanović Daniel, et al.
Published: (2023-01-01) -
Importance of planning the open pits in the conditions of contemporary mining: A case study: The open pit South mining district Majdanpek
by: Kržanović Daniel, et al.
Published: (2017-01-01) -
Stripping delay analysis in relation to designed long-term plan of excavation at the open pit Veliki Krivelj
by: Vaduvesković Zoran, et al.
Published: (2013-01-01) -
Analysis the long-term development of the open pit North Mining District Majdanpek for the capacity of 5x106 tons of ore annually
by: Kržanović Daniel, et al.
Published: (2015-01-01) -
Effect of stage development of mining operations on maximization the net present value in long-term planning of open pits
by: Kržanović Daniel, et al.
Published: (2014-01-01)