Optimized Flood Control Scheduling of Goupitan Reservoir Based on Dynamic Programming and Grey Wolf Algorithm

Based on the analysis of the importance of different time periods for flood control, this paper proposed a solution approach that segments flood control into key and non-key periods. An efficient solution algorithm for the flood control model that coupled dynamic programming and grey wolf algorithm...

Full description

Bibliographic Details
Main Authors: FENG Huan, SU Huaying, LIU Chenliang, LIU Haili, LUO Zhimin
Format: Article
Language:zho
Published: Editorial Office of Pearl River 2024-11-01
Series:Renmin Zhujiang
Subjects:
Online Access:http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2024.11.007