REDUCTION OF COST AND TIME CONSUMPTION IN WELL-CONSTRUCTION
A Contractor usually utilizes the available drilling equipment when constructing just one single well. Drilling cost and time consumption in constructing the well MB-1, using the percussion method, and the well MB-2, using the conventional rotary drilling method, call for a separate analysis in orde...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Faculty of Mining, Geology and Petroleum Engineering
1998-12-01
|
Series: | Rudarsko-geološko-naftni Zbornik |
Subjects: | |
Online Access: | http://hrcak.srce.hr/index.php?show=clanak&id_clanak_jezik=20677&lang=en |