REDUCTION OF COST AND TIME CONSUMPTION IN WELL-CONSTRUCTION

A Contractor usually utilizes the available drilling equipment when constructing just one single well. Drilling cost and time consumption in constructing the well MB-1, using the percussion method, and the well MB-2, using the conventional rotary drilling method, call for a separate analysis in orde...

Full description

Bibliographic Details
Main Authors: Mladen Zelenika, Božo Soldo
Format: Article
Language:English
Published: Faculty of Mining, Geology and Petroleum Engineering 1998-12-01
Series:Rudarsko-geološko-naftni Zbornik
Subjects:
Online Access:http://hrcak.srce.hr/index.php?show=clanak&id_clanak_jezik=20677&lang=en