MSHE-PWM harmonic suppression method of mine hoist active front end

In view of problem of harmonic pollution and system loss of active front end of 10 kV high voltage mine hoist, MSHE-PWM harmonic suppression method was proposed. ANPC five-level topology mathematical model was established to analyze MSHE-PWM harmonic suppression principle and solve MSHE-PWM nonlinea...

Full description

Bibliographic Details
Main Authors: WAN Jun, WANG Yu, WEN Xiaofei
Format: Article
Language:zho
Published: Editorial Department of Industry and Mine Automation 2015-03-01
Series:Gong-kuang zidonghua
Subjects:
Online Access:http://www.gkzdh.cn/article/doi/10.13272/j.issn.1671-251x.2015.03.005