Transmission adaptability planning considering cluster correlation of wind farms
Abstract Wind farm cluster penetration and its long‐distance delivery have become the important form of wind power accommodation of power network in China. For the adaptability of power network planning to the output volatility of clustering wind farms, three steps are studied as follows. Initially,...
Main Authors: | , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2022-03-01
|
Series: | IET Generation, Transmission & Distribution |
Online Access: | https://doi.org/10.1049/gtd2.12342 |