Crack mechanism of shield tunnel under excavation of foundation pit

The segmental tunnel lining of existing shield tunnels is highly susceptible to crack and water leakage due to the excavation and unloading effects of adjacent foundation pits, posing significant risks to tunnel operational safety. Consequently, the effective control of crack damage is of paramount...

Full description

Bibliographic Details
Main Authors: Yang Yu, Jinchang Wang
Format: Article
Language:English
Published: AIP Publishing LLC 2025-02-01
Series:AIP Advances
Online Access:http://dx.doi.org/10.1063/5.0249750