A Good Practice for the Proof Testing of Cable-Stayed Bridges
This paper presents the results and interpretations of static and dynamic tests that were executed on a newly built cable-stayed steel-concrete composite bridge during the final proof testing. A brief description of the structure, the testing methodology, and the used instrumentation are presented....
Main Authors: | , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2022-03-01
|
Series: | Applied Sciences |
Subjects: | |
Online Access: | https://www.mdpi.com/2076-3417/12/7/3547 |