Changing the load of a arrow crane while carrying out loading and unloading works
The stability of self-propelled jib cranes is a key task in the process of their operation. The developed calculation scheme of the arrow self-propelled crane and the restrictions imposed on its movement in time and space, allowed to obtain mathematical dependence of the trajectory of the center of...