Research on an Evaluation Method for the Adaptability of TBM Tunnelling
When a TBM carries out tunnelling in complex strata, there is often low tunnelling efficiency and an increase in tunnelling costs due to the improper selection of tunnelling parameters, the wrong estimation of geological conditions, or adverse geology, so it is necessary to evaluate the tunnelling a...
Główni autorzy: | , , , , , , |
---|---|
Format: | Artykuł |
Język: | English |
Wydane: |
MDPI AG
2022-04-01
|
Seria: | Applied Sciences |
Hasła przedmiotowe: | |
Dostęp online: | https://www.mdpi.com/2076-3417/12/9/4590 |