Lean construction applied to a BIM process: how to control point attribution in MEAT tender process
Lean Construction (LC) and Building Information Modelling are the two methodologies linked by the same objectives. The former is an industrial optimization, which want to achieve the aim of performance increasing with the application to the AEC industry. These two concepts leaded Melzo school tender...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Ar.Tec.
2017-07-01
|
Series: | Tema |
Online Access: | http://artecweb.org/ojs2/index.php/TeMA/article/view/121 |