Lean construction applied to a BIM process: how to control point attribution in MEAT tender process

Lean Construction (LC) and Building Information Modelling are the two methodologies linked by the same objectives. The former is an industrial optimization, which want to achieve the aim of performance increasing with the application to the AEC industry. These two concepts leaded Melzo school tender...

Full description

Bibliographic Details
Main Authors: Valentina Villa, Giuseppe Martino Di Giuda, Paolo Ettore Giana, Lavinia Chiara Tagliabue, Angelo Luigi Camillo Ciribini
Format: Article
Language:English
Published: Ar.Tec. 2017-07-01
Series:Tema
Online Access:http://artecweb.org/ojs2/index.php/TeMA/article/view/121
_version_ 1797669355742298112
author Valentina Villa
Giuseppe Martino Di Giuda
Paolo Ettore Giana
Lavinia Chiara Tagliabue
Angelo Luigi Camillo Ciribini
author_facet Valentina Villa
Giuseppe Martino Di Giuda
Paolo Ettore Giana
Lavinia Chiara Tagliabue
Angelo Luigi Camillo Ciribini
author_sort Valentina Villa
collection DOAJ
description Lean Construction (LC) and Building Information Modelling are the two methodologies linked by the same objectives. The former is an industrial optimization, which want to achieve the aim of performance increasing with the application to the AEC industry. These two concepts leaded Melzo school tender process writing. There are huge differences from a traditional process approach compared with BIM one, which leads project to a coherence high level. A deep LC principles understanding entail a distribution of the point to the different categories. The importance of LC criteria, in terms of points, imposes to the companies a change in the mind-set, from a lowest bid approach to a performance one. The study is based on the analysis of the responses to the case study procurement. Different competitors answer differently in function of Lean principles weight and their knowledge. The change in the state of mind leads the companies to offers value. In some cases, even if, many points were not able to change their behaviour. The behaviour’ modification will be a difficult transformation for the AEC sector.
first_indexed 2024-03-11T20:43:06Z
format Article
id doaj.art-182acf18e9324c6da4e0ce655bb3ff95
institution Directory Open Access Journal
issn 2421-4574
language English
last_indexed 2024-03-11T20:43:06Z
publishDate 2017-07-01
publisher Ar.Tec.
record_format Article
series Tema
spelling doaj.art-182acf18e9324c6da4e0ce655bb3ff952023-10-02T00:35:37ZengAr.Tec.Tema2421-45742017-07-0131354410.17410/tema.v3i1.121121Lean construction applied to a BIM process: how to control point attribution in MEAT tender processValentina Villa0Giuseppe Martino Di Giuda1Paolo Ettore Giana2Lavinia Chiara Tagliabue3Angelo Luigi Camillo Ciribini4Politecnico di TorinoPolitecnico di MilanoPolitecnico di MilanoUniversità degli studi di BresciaUniversità degli studi di BresciaLean Construction (LC) and Building Information Modelling are the two methodologies linked by the same objectives. The former is an industrial optimization, which want to achieve the aim of performance increasing with the application to the AEC industry. These two concepts leaded Melzo school tender process writing. There are huge differences from a traditional process approach compared with BIM one, which leads project to a coherence high level. A deep LC principles understanding entail a distribution of the point to the different categories. The importance of LC criteria, in terms of points, imposes to the companies a change in the mind-set, from a lowest bid approach to a performance one. The study is based on the analysis of the responses to the case study procurement. Different competitors answer differently in function of Lean principles weight and their knowledge. The change in the state of mind leads the companies to offers value. In some cases, even if, many points were not able to change their behaviour. The behaviour’ modification will be a difficult transformation for the AEC sector.http://artecweb.org/ojs2/index.php/TeMA/article/view/121
spellingShingle Valentina Villa
Giuseppe Martino Di Giuda
Paolo Ettore Giana
Lavinia Chiara Tagliabue
Angelo Luigi Camillo Ciribini
Lean construction applied to a BIM process: how to control point attribution in MEAT tender process
Tema
title Lean construction applied to a BIM process: how to control point attribution in MEAT tender process
title_full Lean construction applied to a BIM process: how to control point attribution in MEAT tender process
title_fullStr Lean construction applied to a BIM process: how to control point attribution in MEAT tender process
title_full_unstemmed Lean construction applied to a BIM process: how to control point attribution in MEAT tender process
title_short Lean construction applied to a BIM process: how to control point attribution in MEAT tender process
title_sort lean construction applied to a bim process how to control point attribution in meat tender process
url http://artecweb.org/ojs2/index.php/TeMA/article/view/121
work_keys_str_mv AT valentinavilla leanconstructionappliedtoabimprocesshowtocontrolpointattributioninmeattenderprocess
AT giuseppemartinodigiuda leanconstructionappliedtoabimprocesshowtocontrolpointattributioninmeattenderprocess
AT paoloettoregiana leanconstructionappliedtoabimprocesshowtocontrolpointattributioninmeattenderprocess
AT laviniachiaratagliabue leanconstructionappliedtoabimprocesshowtocontrolpointattributioninmeattenderprocess
AT angeloluigicamillociribini leanconstructionappliedtoabimprocesshowtocontrolpointattributioninmeattenderprocess