The Past and Present of Discharge Capacity Modeling for Spillways—A Swedish Perspective
Most of the hydropower dams in Sweden were built before 1980. The present dam-safety guidelines have resulted in higher design floods than their spillway discharge capacity and the need for structural upgrades. This has led to renewed laboratory model tests. For some dams, even computational fluid d...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2019-01-01
|
Series: | Fluids |
Subjects: | |
Online Access: | http://www.mdpi.com/2311-5521/4/1/10 |