Metaheuristics for a Flow Shop Scheduling Problem with Urgent Jobs and Limited Waiting Times

This study considers a scheduling problem for a flow shop with urgent jobs and limited waiting times. The urgent jobs and limited waiting times are major considerations for scheduling in semiconductor manufacturing systems. The objective function is to minimize a weighted sum of total tardiness of u...

Full description

Bibliographic Details
Main Authors: BongJoo Jeong, Jun-Hee Han, Ju-Yong Lee
Format: Article
Language:English
Published: MDPI AG 2021-11-01
Series:Algorithms
Subjects:
Online Access:https://www.mdpi.com/1999-4893/14/11/323