Incremental Lagrangian Relaxation Based Discrete Gate Sizing and Threshold Voltage Assignment

Timing closure remains one of the most critical challenges of a physical synthesis flow, especially when the design operates under multiple operating conditions. Even if timing is almost closed at the end of the flow, last-mile placement and routing congestion optimizations may introduce new timing...

Full description

Bibliographic Details
Main Authors: Dimitrios Mangiras, Giorgos Dimitrakopoulos
Format: Article
Language:English
Published: MDPI AG 2021-11-01
Series:Technologies
Subjects:
Online Access:https://www.mdpi.com/2227-7080/9/4/92