Chronographical Spatiotemporal Scheduling Optimization for Building Projects
The arrival of building information modeling and four-dimensional (4D) simulation is forcing the construction industry to adapt its contractual, operational, and technical modes. Currently, the 4D simulation model is either a bar chart or a linear diagram. Both methods are unsuitable for modeling bu...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
Frontiers Media S.A.
2019-04-01
|
Series: | Frontiers in Built Environment |
Subjects: | |
Online Access: | https://www.frontiersin.org/article/10.3389/fbuil.2019.00036/full |