Uncertainty analysis on flood routing of embankment dam breach due to overtopping failure

Abstract The breach risk of reservoir dam exists objectively while exerting benefits. There is great uncertainty in the overtopping breach process of embankment dam and the dam break flood routing which affects the accuracy of dam risk analysis and may cause unnecessary waste in emergency scheduling...

Full description

Bibliographic Details
Main Authors: Miaofan Yang, Qian Cai, Zhuo Li, Jiangui Yang
Format: Article
Language:English
Published: Nature Portfolio 2023-11-01
Series:Scientific Reports
Online Access:https://doi.org/10.1038/s41598-023-47542-6