Silver recovery from zinc metallurgical sludge – analysis of solutions
During the hydrometallurgical process of zinc production, conducted in the ZGH “Bolesław” S.A. in Bukowno [Mine and Metallurgical Plant], about 40,000 tons of sludge is generated. After dehydration in the Larox filter presses, sludge contains ca. 16-18% of Zn, 20-25% of Fe, and 200-300 ppm of Ag. Ne...
Main Authors: | , , , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2017-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2017/06/e3sconf_mec2017_01027.pdf |