Systematic Design of a 3-DOF Dual-Segment Continuum Robot for In Situ Maintenance in Nuclear Power Plants

In situ maintenance works for nuclear power plants are highly beneficial as they can significantly reduce the current maintenance cycle and cost. However, removing absorber balls in a constrained environment through an inspection port is fairly challenging. In this article, a 3-DOF dual-segment cont...

Full description

Bibliographic Details
Main Authors: Guoxin Li, Jingjun Yu, Dailin Dong, Jie Pan, Haoran Wu, Shengge Cao, Xu Pei, Xindong Huang, Jianqing Yi
Format: Article
Language:English
Published: MDPI AG 2022-07-01
Series:Machines
Subjects:
Online Access:https://www.mdpi.com/2075-1702/10/7/596
Description
Summary:In situ maintenance works for nuclear power plants are highly beneficial as they can significantly reduce the current maintenance cycle and cost. However, removing absorber balls in a constrained environment through an inspection port is fairly challenging. In this article, a 3-DOF dual-segment continuum robot system is proposed which is equipped with an end-effector to remove absorber balls by pneumatic conveying. Then, according to the symmetrical layout of actuation ropes, the kinematics of the single-segment continuum robot are extended, and the kinematics equation which is universal to the continuum robot with the dual segment is summarized. In addition, some special kinematics solutions can be obtained according to opposite-bending and feeding characteristics. Finally, the functions of the device are verified by tests. The results show that the continuum robot can smoothly pass through the divider plug and reach any position at the bottom of a ball-storage tank where absorber balls are located with only two segments. In a gas environment, the efficiency of absorber ball removal can reach 58.96 kg/h with a lift of 7.5 m and 48.54 kg/h with a lift of 10 m. This result undoubtedly paves the way for the in-service maintenance of nuclear power plants.