LHAASO on Cosmic Ray Knees

LHAASO construction was complete in July 2021. The full array is operating very stably since then. All arrays, KM2A, WCDA and WFCTA are calibrated, including the absolute energy scale at 21 TeV, which was measured by using WCDA and propagated to WFCTA, with the uncertainty will be reduced down <1...

Full description

Bibliographic Details
Main Author: Cao Zhen
Format: Article
Language:English
Published: EDP Sciences 2023-01-01
Series:EPJ Web of Conferences
Online Access:https://www.epj-conferences.org/articles/epjconf/pdf/2023/09/epjconf_uhecr2023_02002.pdf