Machine scheduling of time-dependent deteriorating jobs with determining the optimal number of rate modifying activities and the position of the activities
In this paper, we consider a single machine scheduling problems integrating with deterioration effect and rate-modifying activities (RMAs). The scheduling problem assumes that the machine may have multiple RMAs and each job has the processing time with deterioration effect increased depending upon t...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
The Japan Society of Mechanical Engineers
2015-03-01
|
Series: | Journal of Advanced Mechanical Design, Systems, and Manufacturing |
Subjects: | |
Online Access: | https://www.jstage.jst.go.jp/article/jamdsm/9/1/9_2015jamdsm0007/_pdf/-char/en |