Multi-Objective Parallel Machine Scheduling with Eligibility Constraints for the Kitting of Metal Structural Parts

This paper studied a class of coupling problems of material assignment, part nesting, kit delivery and parallel machine scheduling. The aim of this paper was to solve the scheduling problem of metal structural part processing and welding assembly with eligibility constraints. A two-stage mixed-integ...

Full description

Bibliographic Details
Main Authors: Xiaofei Zhu, Jiazhong Xu, Jianghua Ge, Yaping Wang, Zhiqiang Xie
Format: Article
Language:English
Published: MDPI AG 2022-09-01
Series:Machines
Subjects:
Online Access:https://www.mdpi.com/2075-1702/10/10/836