Method of Calculation of Current of the Ground Faults in the Parallel Overhead Transmission Lines 110-220 Kv
The mutual induction between the phase wires of the different overhead lines which situate close to each other cause unbalanced redistribution of currents in the line wires. This leads to emergence of the outof-balance zero sequence current which affects negatively on the sensitivity of the zero-seq...
Main Authors: | Ukraintsev Alexandr V., Nagay Ivan V. |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2017-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | http://dx.doi.org/10.1051/matecconf/20179101021 |
Similar Items
-
ECONOMIC CORRECTION OF CURRENT DENSITIES IN THE WIRES OF THE EXISTING OVERHEAD LINES OF 110-220 KV
by: A. A. Gerkusov, et al.
Published: (2019-01-01) -
Progress in overhead lines and cables for 220kv and above
by: 379261 Conference on Progress in Overhead Lines and Cables for 220kv and above (1968 : London) -
Dynamic Rating of 110 kV Overhead Lines
by: Adam Babś, et al.
Published: (2016-09-01) -
REGIMES OF 110—330 KV SINGLE-CIRCUIT OVERHEAD TRANSMISSION LINES WITH REDUNDANT PHASE
by: Dmitry Sergeyevich Levin
Published: (2013-03-01) -
Universal Switch for Measuring the Resistance of the Grounding Device Supports of the 110 kV Overhead Power Line
by: M.V. Borodin, et al.
Published: (2020-12-01)