Full Load Test for the Sheikh Jaber Al-Ahmad Al-Sabah Causeway Bridge (PSC Girder: 35 M)

The Sheikh Jaber Al-Ahmad Al-Sabah Causeway consists of an asymmetric cable-stayed bridge (340 m) and a prestressed concrete (PSC) box girder bridge (35.80 km) linking Kuwait City and Northern Kuwait. The full load tests were performed on the PSC box girder bridge and the load scale was set to 14,09...

Full description

Bibliographic Details
Main Authors: Kwangsoo Kim, Dooyong Cho, Raechul Lee, Sangcheol Lee, Joungyong Park, Inbaek Hwang
Format: Article
Language:English
Published: MDPI AG 2023-07-01
Series:Engineering Proceedings
Subjects:
Online Access:https://www.mdpi.com/2673-4591/36/1/41