Full Load Test for the Sheikh Jaber Al-Ahmad Al-Sabah Causeway Bridge (PSC Girder: 35 M)
The Sheikh Jaber Al-Ahmad Al-Sabah Causeway consists of an asymmetric cable-stayed bridge (340 m) and a prestressed concrete (PSC) box girder bridge (35.80 km) linking Kuwait City and Northern Kuwait. The full load tests were performed on the PSC box girder bridge and the load scale was set to 14,09...
Main Authors: | , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2023-07-01
|
Series: | Engineering Proceedings |
Subjects: | |
Online Access: | https://www.mdpi.com/2673-4591/36/1/41 |