Mid and long-term optimize scheduling of cascade hydro-power stations based on modified GA-POA method

In this paper, to explore the efficiency and rationality of the cascade combined generation, a cascade combined optimal model with the maximum generating capacity is established, and solving the model by the modified GA-POA method. It provides a useful reference for the joint development of casc...

Full description

Bibliographic Details
Main Authors: J. Li, X. Yang
Format: Article
Language:English
Published: Copernicus Publications 2018-06-01
Series:Proceedings of the International Association of Hydrological Sciences
Online Access:https://www.proc-iahs.net/379/199/2018/piahs-379-199-2018.pdf