Mid and long-term optimize scheduling of cascade hydro-power stations based on modified GA-POA method
In this paper, to explore the efficiency and rationality of the cascade combined generation, a cascade combined optimal model with the maximum generating capacity is established, and solving the model by the modified GA-POA method. It provides a useful reference for the joint development of casc...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Copernicus Publications
2018-06-01
|
Series: | Proceedings of the International Association of Hydrological Sciences |
Online Access: | https://www.proc-iahs.net/379/199/2018/piahs-379-199-2018.pdf |
Summary: | In this paper, to explore the efficiency and rationality of the
cascade combined generation, a cascade combined optimal model with the
maximum generating capacity is established, and solving the model by the
modified GA-POA method. It provides a useful reference for the joint
development of cascade hydro-power stations in large river basins. The
typical annual runoff data are selected to calculate the difference between
the calculated results under different representative years. The results
show that the cascade operation of cascaded hydro-power stations can
significantly increase the overall power generation of cascade and ease the
flood risk caused by concentration of flood season. |
---|---|
ISSN: | 2199-8981 2199-899X |