Evaluation of the Pullout Behavior of Pre-Bored Piles Embedded in Rock

The subject of this study is dry process caisson tube method cofferdam (hereinafter called C.T cofferdam). This C.T cofferdam is designed to use the skin friction of the drilled shaft embedded into the rock for stability of buoyancy. A pre-bored pile embedded in the bedrock was pulled out due to the...

Full description

Bibliographic Details
Main Authors: Kyungho Park, Daehyeon Kim, Gyudeok Kim, Wooyoul Lee
Format: Article
Language:English
Published: MDPI AG 2021-09-01
Series:Materials
Subjects:
Online Access:https://www.mdpi.com/1996-1944/14/19/5593