Analysis of attitude adjustment for airborne drilling rig of anchor excavator
The deployment of the front drilling rig requires a significant amount of time before and after water exploration and drainage operations. Loading advanced drilling equipment on the anchor excavator can reduce equipment deployment time and improve drilling efficiency. At present, research on anchor...
Main Authors: | , , , , , |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Department of Industry and Mine Automation
2024-01-01
|
Series: | Gong-kuang zidonghua |
Subjects: | |
Online Access: | http://www.gkzdh.cn/article/doi/10.13272/j.issn.1671-251x.2023060016 |