Structure Integrity Analysis Using Fluid–Structure Interaction at Hydropower Bottom Outlet Discharge
Dam reliability analysis is performed to determine the structural integrity of dams and, hence, to prevent dam failure. The Chenderoh Dam structure is divided into five parts: the left bank, right bank, spillway, intake section, and bottom outlet, with each element performing standalone functions to...
Main Authors: | , , , , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2023-03-01
|
Series: | Water |
Subjects: | |
Online Access: | https://www.mdpi.com/2073-4441/15/6/1039 |