STUDY OF THE DYNAMICS OF THE TRAVELING BLOCK-CROWN BLOCK MECHANISM OF THE DRILLING RIG WITH TWO ACTIVE DRAWWORKS
In the hoisting equipment, the hoisting or lowering of the load at the hook is done with the drilling cable that connects the sheaves from the crown-block and those from the travelling-block. Failure of the drilling line can have catastrophic effects, hence it is very important to evaluate as accura...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Petroleum-Gas University of Ploiesti
2021-06-01
|
Series: | Romanian Journal of Petroleum & Gas Technology |
Subjects: | |
Online Access: | http://jpgt.upg-ploiesti.ro/wp-content/uploads/2021/06/07_RJPGT_no.1_2021_Niculae-C_Tanase-M.pdf |