AUTOMATING THE CONSTRUCTION OF BUS BAYS WITH REINFORCED CONCRETE
When renovating intensively used bus bays, roads and squares, the need for their periodical closure to traffic during the period of works is inconvenient. In the case of concrete surface repairs, this timeline is additionally elongated due to the standard requirement of a 28-day curing period. The D...
1. autor: | |
---|---|
Format: | Artykuł |
Język: | English |
Wydane: |
Silesian University of Technology
2018-09-01
|
Seria: | Scientific Journal of Silesian University of Technology. Series Transport |
Hasła przedmiotowe: | |
Dostęp online: | http://sjsutst.polsl.pl/archives/2018/vol100/203_SJSUTST100_2018_Wieckowski.pdf |