Evaluating the Use of the Activity Based Costing Method in the Construction Industry in the V4 Countries
This paper evaluates the situation regarding the use of the Activity Based Costing calculation method in the sphere of industry construction in the V4 countries at the present time. The objective of the paper is to describe the strengths and weaknesses of the ABC method in comparison with the tradit...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
University of Novi Sad, Faculty of Technical Sciences
2019-12-01
|
Series: | International Journal of Industrial Engineering and Management |
Subjects: | |
Online Access: | http://ijiemjournal.org/counter/click.php?id=vol10_04_02 |