A Method for Calculating the Instability Probability in a Deeply Buried Tunnel Construction with a Hidden Karst Cave at the Bottom
In order to quantitatively assess the risk of deeply buried tunnel construction in the case of a hidden karst cave at the bottom of the tunnel, the first deeply buried tunnel construction failure model (PH−1) is firstly proposed based on the upper bound theorem of limit analysis and Protodyakonov’s...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2024-02-01
|
Series: | Applied Sciences |
Subjects: | |
Online Access: | https://www.mdpi.com/2076-3417/14/5/1691 |