A Method for Calculating the Instability Probability in a Deeply Buried Tunnel Construction with a Hidden Karst Cave at the Bottom

In order to quantitatively assess the risk of deeply buried tunnel construction in the case of a hidden karst cave at the bottom of the tunnel, the first deeply buried tunnel construction failure model (PH−1) is firstly proposed based on the upper bound theorem of limit analysis and Protodyakonov’s...

Full description

Bibliographic Details
Main Authors: Bo Wu, Wentao Sun
Format: Article
Language:English
Published: MDPI AG 2024-02-01
Series:Applied Sciences
Subjects:
Online Access:https://www.mdpi.com/2076-3417/14/5/1691